This blog is intended to document the project development and physical production of our large-scale, interactive installation from my own individual perspective. The installation is being produced as a collaborative major project for our BA(hons) degree in Contemporary Media Practice at the University of Westminster 2010.

Sunday, 2 May 2010

Weekly schedule 03 / 05 / 10

Monday  (Andy at work):

  • Make final adjustments to blueprints and divide up ready for copying to acetate on tuesday morning
  • Gather wood at the space
  • Explore praxinoscope in more detail, carry out some testing
  • Get table for transition machine
  • Finalise design + specific measurements for transition machine tower

Tuesday (Andy at work):

  • Buy more paper in atlantis first thing
  • Copy blueprints onto acetate
  • Give Dave final design and measurements for transition machine tower
  • Cut rod 10cm longer than cam-shaft for pivot on boot machine
  • Do cyanotype printing of blueprints
  • Move stuff out of J.1.17 to hackney with Bedford in evening
Wednesday:
  • Praxinoscope + Bootmachine construction (mounts and mechanisms)
  • Start working together the research
  • Send Chris directions to space, confirm time and email andy about long-play tapes!
Thursday:
  • Praxinoscope + Bootmachine construction (have working by end of day)
  • Build darkroom into the space
  • Carry on working with the research
Friday:
  • Chris visits the space
  • Have both machines working
  • Start working on circuits and code
  • Build microphone spool
  • Plan sound recordings and VHS